Leave dates blank to auto-fit the shell around its tasks. Set them to lock the sprint window.
Paste an Outline doc (or fetch via API). It reads your real structure: a ## Development / DevOps / ML heading sets the team; each top-level checklist item (with its emoji, [Tag] and Trello link) becomes a feature; nested Backend/Frontend/QA/ML (date) items become tasks ([x]=done, 🐞=bug). Dates like (19.05-20.05) are durations; (22.05 → 27.05) is read as a reschedule (baseline 22.05 → moved to 27.05), so the slip shows up automatically. Struck-through items are skipped.
Token is stored only in this browser. Your self-hosted Outline must allow this page's origin (CORS) for a browser fetch to succeed — if it's blocked, just paste the doc above instead.